Works to reduce future flood impacts at Riverside Park near Uki will get underway from Monday 18 September 2023. Last year's flood was the largest on record and caused severe erosion along the middle reaches of the Tweed River downstream of Uki, resulting in major damage to riverbanks, roads, bridges and riparian vegetation. The disaster left Riverside Park, opposite Glenock Road, in critical need of restoration after it lost more than 45 m of vegetated bank, leaving parts of the bank just 5 to 15 metres away from busy Kyogle Road.
https://www.miragenews.com/stabilisation-works-to-begin-at-riverside-park-1083159/#miragenews
You must login before you can post a comment.